Nobody should be surprised. Not by the design, the programme or the cost.
Four stages, in the same order, every time — and a set of working rules about reporting, changes and honesty that matter more than the stages do.
Most projects fail in the sequence, not the execution.
Cabinetry measured before the floor level was set. Lighting positions decided after the ceiling closed. Furniture ordered before the room dimensions were confirmed. A wall moved after the tiling. None of these are craftsmanship failures — every one is a sequencing failure, and every one is expensive.
The process below exists to make the expensive decisions early, when they are still drawings, and to make the irreversible ones late, when everything they depend on is already fixed.
It also exists to make the project legible to you. At every stage you should know what has been decided, what is still open, what it costs, and what happens next.
What happens, and what you receive.
Brief
We visit the property and measure it. We ask how you actually use the space, what fails about it now, and what has to be true when we finish. Constraints get established here rather than discovered later: structure, services, drainage, tenure, landlord conditions, permits and the dates that cannot move.
If the project needs licensed architectural, structural or engineering input, this is where we say so — before any design work implies otherwise.
Concept
Layout options, material and finish palette, lighting design, joinery drawings and a furniture schedule. Physical samples, not swatches on a screen. Then a priced scope with exclusions stated in plain language, so what is not included is as visible as what is.
This is a paid stage. It is also the stage where the project’s cost is genuinely decided, which is why it comes before any construction commitment.
Execution
Site works, joinery manufacture, furniture production and landscaping run in parallel against one programme, coordinated by us. Specialist trades sit under that coordination rather than reporting to you. Progress is reported on a fixed rhythm with photographs.
Anything that changes the scope is priced and approved in writing before it happens. Discoveries on site are reported the day they are found, not at the end.
Result
Furniture installed, styling completed, then a walkthrough with you to raise the snag list. The list is worked and closed. The project is complete when it is empty — not when the trades pack up.
You are handed care and maintenance guidance for the specific finishes and materials installed, because a finish that is cleaned wrongly fails as surely as one specified wrongly.
Reference imagery. Project photography replaces this as work is documented. [VERIFY]
The four commitments that matter more than the diagram.
Any company can draw a four-stage process. What actually determines whether a project is a good experience is how a firm behaves on the days when something goes wrong.
How pricing actually works here.
We do not publish package prices, and we do not quote before survey. Both practices exist to win enquiries, not to serve clients.
- No price before survey. A figure given before the property has been seen is either a guess or a hook, and both end in a difficult conversation later.
- Design is paid. Specification is the work that determines cost, and free design has to be recovered somewhere — usually in the build price.
- Exclusions are written. What is not in the scope appears in the scope document, in plain words, at the same size as what is.
- Variations are priced first. Approved in writing before they are carried out, so the final figure is never a surprise.
- Honest scaling. If the budget will not deliver the brief, we will tell you which parts to do properly now rather than doing all of it thinly.
Approving a project you cannot walk through.
Diaspora owners are a large share of this market and are routinely served badly. The failure mode is always the same: silence, then a request for more money.
Our answer is structural rather than reassuring. Reporting happens on a schedule you can hold us to. Decisions arrive as documented options with photographed samples, so you are choosing rather than trusting. And no variation is ever carried out on a verbal agreement.
- Fixed reporting day
- Progress written and photographed on an agreed day each cycle, regardless of whether there is movement to report.
- Documented options
- Material and finish decisions presented as photographed, described choices rather than requests to trust our judgement.
- Written approvals
- Every variation priced and approved in writing. Nothing proceeds on a phone call.
- One named contact
- A single person answerable for the project, rather than a rotating set of trades. [VERIFY] team structure
How we work, answered.
Do you charge for the first consultation?
The initial consultation and site visit establish whether there is a project and whether we are the right people for it. Whether a fee applies depends on travel and the depth of assessment required, and we tell you before we attend rather than afterwards. Design and specification stages are always paid work. [VERIFY] confirm the standing consultation-fee policy
Why will you not give a price on the phone?
Because a number given before a survey is either a guess or a hook, and both end badly. What we can do on a first call is tell you what work of the kind you are describing generally involves, and what the main cost drivers in a property like yours will be.
What happens if the cost changes during the project?
Variations are priced and approved in writing before the work is carried out. If something is discovered on site that changes the scope — and on renovation projects that does happen — you are told immediately, with the cost implication, and you decide.
Can we stop after the design stage?
Yes. Design and specification can be commissioned as a standalone engagement. You own the output and are free to build it elsewhere, though we will tell you honestly which parts of the design assume our workshop.
How often will we hear from you?
On a fixed reporting rhythm agreed at the start, with photographs, whether or not there is good news that week. Reactive updates — where the client has to chase — are the single most common complaint about this industry and the easiest one to design out.
Who is actually on site?
A named project contact carries the job from brief to handover, with trades and specialists coordinated under our programme rather than yours. You should not have to know which subcontractor is responsible for what. [VERIFY] team structure and named roles
What does handover include?
A walkthrough, a raised and closed snag list, and written care and maintenance guidance for the finishes and materials installed. Any defects-liability or warranty terms are set out in the contract; we do not advertise terms on this site that are not yet finalised. [VERIFY]
Stage one is a conversation.
It costs you a site visit and an honest description of the problem. What you get back is a straight view of what the work involves — including whether it is worth doing at all.
Consultations begin with a site visit and a conversation about how the space needs to work. Scope, drawings and cost follow from that — never before it.